Südmetall production facilities
in Maisach








Maisach

Hall 1 2,531; Hall 2 2,857

H 1 70 / 37 / 11.10 m; H 2 60 / 30 / 11.10 m

Production facilities, Office buildings

Turnkey

May 2019 – Apr 2020
Description of the facility
BREMER has been contracted to construct an estate for Leonhard Grundstücksverwaltungs GbR consisting of 2 warehouses/production halls, a 3-storey office building and outdoor facilites. The three buildings stand in a row, covered passages are in between. Projecting roofs made from steel are attached to the facades.