SEMIKRON

in Nuremberg

SEMIKRON in NurembergSEMIKRON in Nuremberg1SEMIKRON in Nuremberg2
Location

Nuremberg

Floor area

production: 9,500 office: 1,800 sqm

Length/width/height

production: 79 / 50 / 13.25 office: 60 / 19 / 17.40 m

Type of building

Production facilities,  Office buildings

Scope of supply and services

turnkey

Period of construction

May 2016 - July 2017

Description of the facility

The building consists of two sections, C2 and C3, providing production and warehouse facilities. They are separated by a fire wall. Both halls are single-storey buildings except for one part of C2, which has a mezzanine level at 7.50 m above finished floor level. A 4-storey head-end building with offices and social facilities is planned on the west side of C3. It will be separated from halls C2 and C3 by a fire wall.