Deutsche SiSi-Werke BA II

in Eppelheim

Deutsche SiSi-Werke BA II in Eppelheim6Deutsche SiSi-Werke BA II in Eppelheim7Deutsche SiSi-Werke BA II in Eppelheim8Deutsche SiSi-Werke BA II in Eppelheim9Deutsche SiSi-Werke BA II in Eppelheim10Deutsche SiSi-Werke BA II in Eppelheim11
 
Building data
Location
Eppelheim
Floor area
9,625 sqm
Length/width/height
150 / 100 / 16 m
Type of building
Production facilities,  Logistikgebäude
Scope of supply and services
extended shell
Period of construction
Sep. 2013 – June 2014
Special features
After the on-time completion of construction stage 1 to the client's satisfaction, Wild awards us the second construction stage directly afterwards.
Description of the facility
Construction stage 2 consists of 4 individual buildings – buildings HPW 4–7 – comprising a 3 storey logistics building with upper-level office and social facility section, a 3-storey technical and service building, a high-bay warehouse and a transport bridge. Special foundations are needed for the 1 m thick base of the 5,500 m² high-bay warehouse. The entire structure consists of precast reinforced concrete elements from BREMER's own production plants. Because of food industry regulations, work in all trades needs to be carried out to higher standards. The architecture is in line with the company's CI, which is maintained worldwide.