Gerry Weber

in Halle / Westphalia

Gerry Weber in Halle / Westphalia4Gerry Weber in Halle / Westphalia5Gerry Weber in Halle / Westphalia6Gerry Weber in Halle / Westphalia7
Building data
Location
Halle / Westphalia
Floor area
68,000 sqm
Length/width/height
210 / 150 / 30.00 m
Type of building
Prefabricated products,  Logistikgebäude
Scope of supply and services
FT / extended shell
Period of construction
Aug. 2014 – March 2015
Special features
Sophisticated building bracing.
Description of the facility
The building consists of three 25-30 m high halls, the middle hall extending over 4 floors. In front of the halls is a 3-storey head-end structure. The halls are all separated by fire walls.