ZEG

in Kornwestheim

ZEG in KornwestheimZEG in Kornwestheim1ZEG in Kornwestheim2
 
Building data
Location
Kornwestheim
Floor area
logistics: 20,000, office: 3,600 sqm
Length/width/height
logistics: 290 / 69 / 11.45 office: 14 / 66 / 11.45
Type of building
Logistics building,  Office buildings
Scope of supply and services
turnkey
Period of construction
May 2015 - April 2016
Description of the facility

This construction project is for a dual warehouse and administrative building. An elaborate sprinkler system is installed under the hall roof. The hall is faced with an insulated panel facade, the administrative building features fibre cement cladding.  The flat roof will be greened.