XXXLutz

in Uffenheim

XXXLutz in Uffenheim3XXXLutz in Uffenheim4XXXLutz in Uffenheim5
 
Building data
Location
Uffenheim
Floor area
42,700 sqm
Length/width/height
117 / 180 / 20.2 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
June 2015 – Nov. 2015
Description of the facility
Yet another contract carrying forward a long-standing business relationship. The extension of the XXXLutz central warehouse consists of 3 hall sections separated by fire walls. Apart from featuring generous areas for receiving and despatch operations with a total of 64 docks, the building also includes multiple stacked mezzanine levels. Some accommodate offices and ancillary rooms, others – with double-T slabs for greater strength – are used for logistical purposes. The storage area is designed for a conventional warehouse and a narrow-aisle warehouse with extra-even surfaces and clear heights of more than 16 m. The entire building consists of precast elements made at BREMER's own production plants. The facility is realised as a turnkey project including all technical installations and all exterior facilities, for which approx. 80,000 cbm of earth first needs to be moved.