WPG LOG3

in Hockenheim

WPG LOG3 in HockenheimWPG LOG3 in Hockenheim1WPG LOG3 in Hockenheim2
 
Building data
Location
Hockenheim
Floor area
halls: 9,560 sqm, office: 226 sqm
Length/width/height
hall1: 106/57/15 m. hall2: 69/51/11.4 m. office: 21/11/8 m
Type of building
Logistics building,  Office buildings
Scope of supply and services
turnkey
Period of construction
July 2012 - Jan. 2013
Special features

Logistics building with adjoining two-storey office building.

Description of the facility

This is the third time BREMER AG has been engaged to undertake a construction project for Weidenhammer. The contract is for the construction of a new logistics building in precast reinforced concrete elements with a cassette and trapezoidal sheet metal facade. The roof is of trapezoidal sheet metal with insulation and impermeable membrane. The frontal office building adjoining the hall is realised as a precast reinforced concrete element structure. The hall is divided by a partition wall of the standard required to separate rental areas. The halls are fitted with sprinklers.