in Schönefeld
Unitax logistics centre

Schönefeld

14,335 sqm

169 / 73 / 12.50 m

Logistics building

turnkey

Dec. 2012 – Aug. 2013

Description of the facility
The facility is divided into units 1 & 2, a front office building and a 2-storey production and storage zone in unit 2. Because of the proximity to Schönefeld Airport, measures to reduce radar reflection are required and are realised by BREMER. The precast reinforced concrete elements for this project come from the main production plant in Paderborn, with certain components fabricated at the new Leipzig plant.
Special features
This is the second contract awarded to BREMER by Verdion (formerly Helios) for a logistics centre at the Air Link Park Berlin