SIG220
in Nuremberg





Nuremberg

9,858 + 2,465 sqm

109 / 82 / 13.2 + 10 / 82 / 18.3 m

Logistics building

turnkey

Nov. 10 – May 11
Special features
Logistics building with integrated projecting office building.
Description of the facility
The newbuild project involves the construction of a logistics facility as a precast reinforced concrete structure: the hall facade consists of a cassette facade with trapezoidal sheet panelling. The roof is comprised of trapezoidal sheeting lined with insulation and membrane. The projecting office building in front adjoins the hall as a precast reinforced concrete structure and features a glass facade with partial composite thermal insulation. The office building is a three-storey structure and is accessed via an internal stairwell and an elevator system.