PANALPINA logistics hall with office building

in Nuremberg

PANALPINA logistics hall with office building in NurembergPANALPINA logistics hall with office building in Nuremberg1PANALPINA logistics hall with office building in Nuremberg2
 
Location

Nuremberg

Floor area

10,000 sqm (hall) / 7,768 sqm (office building 1+2)

Length/width/height

100 / 91 / 14 (hall) . 59 / 14 / 26 (office 1). 36 / 25 / 12 (office 2)

Type of building

Logistics building,  Office buildings

Scope of supply and services

turnkey

Period of construction

May 2007 - Aug. 2008

Special features

This 7-storey office building with warehouse and parking deck (160 spaces) is the second construction contract that BREMER SYSTEMBAU GmbH has realised for PANALPINA Welttransport GmbH. What is special about the building are the building services. Heating and cooling for the administrative building and ground heating for the warehouse are provided entirely by geothermal energy. The geothermal probes are sunk to depths up to around 75 m.

Description of the facility

The office building consists of seven office floors as well as service and archive space on the ground floor. From the floor slab upwards, it is realised entirely in precast reinforced concrete elements. The facade consists of aluminium strip windows and fibre cement panels. The building is accessed by a central stairwell core with elevator. The warehouse is similarly realised in precast reinforced concrete elements, with a single row of interior columns. The facade consists partly of concrete sandwich elements, partly of a metal cassette facade. A 160-space multi-storey car park built using the patented BREMER system is situated in the outdoor area.