Service centre

in Neutraubling

Neutraubling service centre13Neutraubling service centre14Neutraubling service centre15Neutraubling service centre16Neutraubling service centre17Neutraubling service centre18Neutraubling service centre19Neutraubling service centre20Neutraubling service centre21Neutraubling service centre22Neutraubling service centre23Neutraubling service centre24Neutraubling service centre25
Building data
Location
Neutraubling
Floor area
50,000 sqm
Length/width/height
224.00 / 208.00 / 9.50 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
Oct. 2012 – May 2013
Special features
The client's first construction contract with BREMER AG.
Description of the facility
The new logistics centre is located directly within an industrial zone in Neutraubling. The full project consists of two building sections linked by a connecting tunnel. The structure of the building consists of precast reinforced concrete elements with a steel cassette and trapezoidal sheet facade. All offices and social facilities, with a floor area of approx. 2,500 m², are accommodated in two 2-storey office buildings in front of the halls. The buildings are served by two loading tunnels for unloading HGVs.