Service centre

in Neutraubling

Neutraubling service centreNeutraubling service centre1Neutraubling service centre2Neutraubling service centre3Neutraubling service centre4Neutraubling service centre5Neutraubling service centre6Neutraubling service centre7Neutraubling service centre8Neutraubling service centre9Neutraubling service centre10Neutraubling service centre11Neutraubling service centre12
Building data
Location
Neutraubling
Floor area
50,000 sqm
Length/width/height
224.00 / 208.00 / 9.50 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
Oct. 2012 – May 2013
Special features

The client's first construction contract with BREMER AG.

Description of the facility

The new logistics centre is located directly within an industrial zone in Neutraubling. The full project consists of two building sections linked by a connecting tunnel. The structure of the building consists of precast reinforced concrete elements with a steel cassette and trapezoidal sheet facade. All offices and social facilities, with a floor area of approx. 2,500 m², are accommodated in two 2-storey office buildings in front of the halls. The buildings are served by two loading tunnels for unloading HGVs.