Kühne & Nagel logistics centre

in Nuremberg

Kühne & Nagel logistics centre in NurembergKühne & Nagel logistics centre in Nuremberg1Kühne & Nagel logistics centre in Nuremberg2Kühne & Nagel logistics centre in Nuremberg3Kühne & Nagel logistics centre in Nuremberg4Kühne & Nagel logistics centre in Nuremberg5Kühne & Nagel logistics centre in Nuremberg6Kühne & Nagel logistics centre in Nuremberg7Kühne & Nagel logistics centre in Nuremberg8Kühne & Nagel logistics centre in Nuremberg9Kühne & Nagel logistics centre in Nuremberg10Kühne & Nagel logistics centre in Nuremberg11Kühne & Nagel logistics centre in Nuremberg12
Building data
Location
Nuremberg
Floor area
28,134 sqm
Length/width/height
205/94/14.50 + 72/50/8.5 + 36.5/16.5/14.50 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
Jan. 13 – Oct. 2013
Special features

Professional cooperation with two BREMER AG clients, Kühne & Nagel and Goodman, continues at this site.

Description of the facility

The logistics centre is located on Koperstrasse at the junction with Bremer Strasse in Nuremberg Port and consists of 3 sections (transhipment hall, 4-storey office building and logistics hall). The building is a reinforced concrete element structure with a trapezoidal sheet roof and an insulated element facade. The entire facility is designed for the storage of substances that are classified as hazardous to water (WGK2).