ING MainLog 4 logistics centre

in Neu-Isenburg

ING MainLog 4 logistics centre in Neu-IsenburgING MainLog 4 logistics centre in Neu-Isenburg1ING MainLog 4 logistics centre in Neu-Isenburg2ING MainLog 4 logistics centre in Neu-Isenburg3ING MainLog 4 logistics centre in Neu-Isenburg4ING MainLog 4 logistics centre in Neu-Isenburg5ING MainLog 4 logistics centre in Neu-Isenburg6ING MainLog 4 logistics centre in Neu-Isenburg7ING MainLog 4 logistics centre in Neu-Isenburg8ING MainLog 4 logistics centre in Neu-Isenburg9ING MainLog 4 logistics centre in Neu-Isenburg10ING MainLog 4 logistics centre in Neu-Isenburg11ING MainLog 4 logistics centre in Neu-Isenburg12
 
Location

Neu-Isenburg

Floor area

23,400 sqm

Length/width/height

251/93/12.5 + 13.8 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

Feb. 10 – Aug. 10

Special features

This logistics centre is the first construction project realised by BREMER for ING Real Estate. As well as an eye-catching facade, the services contracted include creating a base seal with PEHD sheeting in accordance with Sect. 19L of the German Water Resources Act (WHG).

Description of the facility

The logistics centre consists of BREMER precast reinforced concrete elements with a trapezoidal sheet metal roof and an insulated facade in the client's preferred colour. Two mezzanine levels for storage/ office use are integrated in the area of the loading axis. The seven units are separated by fire walls (F90 walls) of precast reinforced concrete elements.