Harry Brot production facility
in Berlin






Berlin

5,306 sqm

77 / 72 / 8.00 m

Logistics building

turnkey

May 2018 - Dec 2018
Description of the facility
BREMER has been contracted to build a production facility for Harry Brot in Berlin. The building is realised as an extension to an existing factory building. It is a single-storey structure and consists of 2 halls/fire compartments. The building is served by 12 loading bays and is accessed from the existing hall at 2 points.