greenfield Logistikpark

in Vaihingen-Ost

greenfield Logistikpark in Vaihingen-Ostgreenfield Logistikpark in Vaihingen-Ost1greenfield Logistikpark in Vaihingen-Ost2
 
Location

Vaihingen-Ost

Floor area

42,125 sqm

Length/width/height

370 / 108 / 12.5 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

Aug. 2013 – March 2014

Special features

After a number of successful projects, Greenfield engages BREMER again as general contractor.

Description of the facility

The logistics centre is divided into 5 hall sections and two office extensions. The halls incorporate 3,000 m² of mezzanine space. The entire structure consists of precast reinforced concrete elements made in Paderborn and transported by rail to the South of Germany. The facade of the logistics centre has an attractive accentuated green colour scheme. For enhanced sustainability, the lighting in parts of the building is LED-based. The roof is prepared for the installation of a photovoltaic system. An area of 10,000m² is scheduled for handover within 4 months.