greenfield Logistikpark

in Vaihingen-Ost

greenfield Logistikpark in Vaihingen-Ost3greenfield Logistikpark in Vaihingen-Ost4greenfield Logistikpark in Vaihingen-Ost5
 
Building data
Location
Vaihingen-Ost
Floor area
42,125 sqm
Length/width/height
370 / 108 / 12.5 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
Aug. 2013 – March 2014
Special features
After a number of successful projects, Greenfield engages BREMER again as general contractor.
Description of the facility
The logistics centre is divided into 5 hall sections and two office extensions. The halls incorporate 3,000 m² of mezzanine space. The entire structure consists of precast reinforced concrete elements made in Paderborn and transported by rail to the South of Germany. The facade of the logistics centre has an attractive accentuated green colour scheme. For enhanced sustainability, the lighting in parts of the building is LED-based. The roof is prepared for the installation of a photovoltaic system. An area of 10,000m² is scheduled for handover within 4 months.