greenfield logistics park

in Nuremberg

greenfield logistics parkgreenfield logistics park1greenfield logistics park2greenfield logistics park3
 
Location

Nuremberg

Floor area

20,300 m²

Length/width/height

188/108/12.5 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

Sep. 2017 - March 2018

Description of the facility

The logistics centre is divided into 3 hall sections with two office extensions. The halls also incorporate mezzanine levels. The entire structure consists of precast reinforced concrete elements made in Paderborn. The facade of the logistics centre has an attractive eye-catching green finish. For sustainability, the lighting incorporates LED technology.