greenfield logistics park

in Nuremberg

greenfield logistics park in Nuremberggreenfield logistics park in Nuremberg1greenfield logistics park in Nuremberg2
 
Location

Nuremberg

Floor area

20,101 sqm

Length/width/height

185 / 108 / 12.5 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

Sep. 2014 – April 2015

Special features

After a number of successful projects, Greenfield has again chosen BREMER as general contractor.

Description of the facility

The logistics centre consists of 3 hall sections and an office annex. Inside the halls is 600 m² of mezzanine space. The entire structure consists of precast reinforced concrete elements fabricated in Paderborn. The facade of the logistics centre has an attractive, accentuated green finish. To meet sustainability requirements, parts of the building are fitted with LED lighting. One of the 3 halls will be handed over within 5 months.