greenfield logistics park

in Nuremberg

greenfield logistics park in Nuremberg3greenfield logistics park in Nuremberg4greenfield logistics park in Nuremberg5
 
Building data
Location
Nuremberg
Floor area
20,101 sqm
Length/width/height
185 / 108 / 12.5 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
Sep. 2014 – April 2015
Special features
After a number of successful projects, Greenfield has again chosen BREMER as general contractor.
Description of the facility
<span class="inhalt_text">The logistics centre consists of 3 hall sections and an office annex. Inside the halls is 600 m² of mezzanine space. The entire structure consists of precast reinforced concrete elements fabricated in Paderborn. The facade of the logistics centre has an attractive, accentuated green finish. To meet sustainability requirements, parts of the building are fitted with LED lighting. One of the 3 halls will be handed over within 5 months. </span>