Goodman Schenker logistics facility

in Nuremberg

Goodman Schenker logistics facility in Nuremberg8Goodman Schenker logistics facility in Nuremberg9Goodman Schenker logistics facility in Nuremberg10Goodman Schenker logistics facility in Nuremberg11Goodman Schenker logistics facility in Nuremberg12Goodman Schenker logistics facility in Nuremberg13Goodman Schenker logistics facility in Nuremberg14Goodman Schenker logistics facility in Nuremberg15
 
Building data
Location
Nuremberg
Floor area
39,266 sqm
Length/width/height
355/109/12.00 bzw. 12.20 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
June 2015 – Feb. 2016
Description of the facility
The logistics centre comprises 5 units – the first four with a clear height of 12 m, the 5th with a clear height of 12.20 m. Units 1 and 5 each have a 2-storey office directly adjoining the hall complex.