Goodman Schenker logistics facility

in Nuremberg

Goodman Schenker logistics facility in NurembergGoodman Schenker logistics facility in Nuremberg1Goodman Schenker logistics facility in Nuremberg2Goodman Schenker logistics facility in Nuremberg3Goodman Schenker logistics facility in Nuremberg4Goodman Schenker logistics facility in Nuremberg5Goodman Schenker logistics facility in Nuremberg6Goodman Schenker logistics facility in Nuremberg7
 
Building data
Location
Nuremberg
Floor area
39,266 sqm
Length/width/height
355/109/12.00 bzw. 12.20 m
Type of building
Logistics building
Scope of supply and services
turnkey
Period of construction
June 2015 – Feb. 2016
Description of the facility

The logistics centre comprises 5 units – the first four with a clear height of 12 m, the 5th with a clear height of 12.20 m. Units 1 and 5 each have a 2-storey office directly adjoining the hall complex.