Goodman Schenker logistics facility

in Nuremberg

Goodman Schenker logistics facility in NurembergGoodman Schenker logistics facility in Nuremberg1Goodman Schenker logistics facility in Nuremberg2Goodman Schenker logistics facility in Nuremberg3Goodman Schenker logistics facility in Nuremberg4Goodman Schenker logistics facility in Nuremberg5Goodman Schenker logistics facility in Nuremberg6Goodman Schenker logistics facility in Nuremberg7
 
Location

Nuremberg

Floor area

39,266 sqm

Length/width/height

355/109/12.00 bzw. 12.20 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

June 2015 – Feb. 2016

Description of the facility

The logistics centre comprises 5 units – the first four with a clear height of 12 m, the 5th with a clear height of 12.20 m. Units 1 and 5 each have a 2-storey office directly adjoining the hall complex.