Goodman logistics centre Am Exer BA 1-6

in Leipzig

Goodman logistics centre Am Exer in LeipzigGoodman logistics centre Am Exer in Leipzig1Goodman logistics centre Am Exer in Leipzig2Goodman logistics centre Am Exer in Leipzig3
 
Location

Leipzig

Floor area

18,000 + 21,000 + 11,000 sqm

Length/width/height

170 / 120 / 12.50 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

March 2013 – Sep. 2013

Description of the facility

Extensive earthworks are needed to develop the site for the planned buildings (Units 1-2/Units 3-5/Units 6-7). The first construction stage involves the realisation of Units 3-5 as well as all site preparation work. The building is a BREMER precast reinforced concrete structure with a trapezoidal sheet roof. The facade consists of a reinforced concrete sandwich base beneath an insulated steel facade. Fronting the logistics complex is a 2-storey office building. For reasons of sustainability, all building sections are heated by a wood pellet heating system in conjunction with underfloor heating. Altogether, the project consists of 3 construction stages. The first involves realising Units 3-5