Goodman

in Rheinberg

Goodman in RheinbergGoodman in Rheinberg1Goodman in Rheinberg2Goodman in Rheinberg3Goodman in Rheinberg4
 
Location

Rheinberg

Floor area

12,000 sqm

Length/width/height

139 / 85 / 13.95 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

Feb. 2015 – July 2015

Special features

Flexible deep-freeze, cold and dry storage facilities. A multifunctional logistics building with integrated cold and deep-freeze storage areas. The finished building will be awarded a silver DGNB certificate.

Description of the facility

The warehouse building incorporates an approx. 8,000 sq m dry storage facility with empties area as well as two deep-freeze and cold storage zones, each with an approximate area of 2,000 sq m. The building is divided into two fire compartments. The cold storage area additionally features so-called "chicken boxes" tailored to the specific requirements of the customer supplied. Adjoining the handling hall at the front of the complex are 18 loading bays. Also planned for this area is a two-storey administrative and social building with a gross floor area of approx. 440 sq m. The entire project including exterior facilities and refrigeration equipment is executed by BREMER AG as a turnkey contract.