bauwo logistics centre

in Achim

bauwo logistics centre in Achimbauwo logistics centre in Achim1bauwo logistics centre in Achim2bauwo logistics centre in Achim3
 
Location

Achim

Floor area

10,800 sqm

Length/width/height

120 / 84 / 12.50 m

Type of building

Logistics building

Scope of supply and services

turnkey

Period of construction

July 2017 - Dec. 2017

Description of the facility

The new logistics centre with mezzanine level and frontal administrative building is under construction on an approx. 24,200 m² site directly alongside the A27 motorway near Bremen. The hall complex has a floor area of 10,800 m² and a total of 12 dock units.