Bauwo logistics centre

in Hodenhagen

Bauwo logistics centre HodenhagenBauwo logistics centre Hodenhagen1Bauwo logistics centre Hodenhagen2Bauwo logistics centre Hodenhagen3Bauwo logistics centre Hodenhagen4
 
Location

Hodenhagen

Floor area

37,145 sqm

Length/width/height

288 / 108 / 14.00

Type of building

Logistics building

Scope of supply and services

Turnkey

Period of construction

Oct. 2019 – May 2020

Description of the facility

The warehouse space is separated into 3 sections by 2 fire walls. 30 loading units as well as a mezzanine space is located at the front side. The office and sanitary areas extend to 1,230 sqm. Outdoor facilites with parking areas are also located on the 81,000 sqm large estate.