logistics building

in Großbeeren

logistics building in Grossbeeren3logistics building in Grossbeeren4logistics building in Grossbeeren5
 
Building data
Location
Großbeeren
Floor area
16,000 sqm
Length/width/height
128 / 106 / 14.00 and 48 / 72 / 14.00 m
Type of building
Cold storage facilities
Scope of supply and services
turnkey
Period of construction
April 2010 – Oct. 2010
Special features
After contracts in Stapelfeld and Oberhausen, this third project in Grossbeeren marks the continuation of a successful partnership with Lekkerland that dates back to 1998.
Description of the facility
The structure of the logistics building consists of BREMER precast reinforced concrete elements. The facade is realised with 4 m high reinforced concrete base panels and steel cassettes. Part of the outer facade is formed by the integrated cold and deep-freeze cells. More office and storage space is accommodated in a two-storey internal structure that similarly consists of precast reinforced concrete elements.