logistics building

in Großbeeren

logistics building in Grossbeerenlogistics building in Grossbeeren1logistics building in Grossbeeren2
 
Location

Großbeeren

Floor area

16,000 sqm

Length/width/height

128 / 106 / 14.00 and 48 / 72 / 14.00 m

Type of building

Cold storage facilities

Scope of supply and services

turnkey

Period of construction

April 2010 – Oct. 2010

Special features

After contracts in Stapelfeld and Oberhausen, this third project in Grossbeeren marks the continuation of a successful partnership with Lekkerland that dates back to 1998.

Description of the facility

The structure of the logistics building consists of BREMER precast reinforced concrete elements. The facade is realised with 4 m high reinforced concrete base panels and steel cassettes. Part of the outer facade is formed by the integrated cold and deep-freeze cells. More office and storage space is accommodated in a two-storey internal structure that similarly consists of precast reinforced concrete elements.