Production facility

in Neu-Wulmstorf

 
Location

Neu-Wulmstorf

Floor area

9,703 sqm

Length/width/height

94 / 77 / 10.05

Type of building

Production facilities

Scope of supply and services

Turnkey

Period of construction

April 2020 – Feb. 2021

Description of the facility

BREMER has been contracted to build a production facility for Zajadacz GmbH in Neu-Wulmstorf.
The building is the extension to an existing hall by approximately 7,000 sqm for production and logistic space; separated by 2 fire walls.  A 2-storey mezzanine space is built above the 18 dock levellers on ground floor. A further storey can be added later.
The outer walls have an iso-façade and a cassette façade.
The floor is made from steel fiber concrete, the grounds are being paved.