WÜST logistics hall

in Heilbronn

 
Building data
Location
Heilbronn
Floor area
10,520 sqm
Length/width/height
114 / 80 / 12.50
Type of building
Logistics building
Scope of supply and services
Turnkey
Period of construction
Jan. 2020 – Aug. 2020
Description of the facility

After the successful completion of construction stage 1 for delivery company Spedition W. Wüst GmbH & Co. KG, BREMER has been contracted for the second phase as well. The automotive manufacturer wants to extend its existing logistics centre. The building contains 4 loading units with projecting roofs and a sprinkler system.