Goodman logistics centre

in Hamburg

 
Building data
Location
Hamburg
Floor area
Hall: 10,353 sqm // Office: 512 sqm
Length/width/height
101 / 84 / 12.50 m
Type of building
Logistics building,  Office buildings
Scope of supply and services
Turnkey
Period of construction
Aug. 2020 - May 2021
Description of the facility

Next to the Airbus logistics hall in Hamburg BREMER has been contracted to build a logistics centre for global property group Goodman.

The estate is located on Elbe waterside and therefore full of sea ooze. Special constructional arrangements are necessary to provide a sufficient bearing capacity.

Despite the challenging requirements, the building is being constructed within a short 8-month period.

The logistics centre receives the certificate Gold by the German Sustainable Building Council (DGNB - Deutsche Gesellschaft für Nachhaltiges Bauen e.V.).

Webcam