Logistics hall

in Buggingen

GARBE logistics hall in Buggingen
 
Location

Buggingen

Floor area

11,600 sqm

Length/width/height

111 / 90 / 12.50 m

Type of building

Logistics building,  Production facilities

Scope of supply and services

Turnkey

Period of construction

Jan. 2020 - Dec. 2020

Description of the facility

On behalf of GARBE BREMER builds a logistics centre and production facility including office spaces for user SLG. Located in Buggingen, the 12,000 sqm hall is separated in production and storage areas.
The integration of the special machines and process technology makes the construction a highly complex requirement.

Webcam