Extension Harry Brot logistics centre

in Großbeeren

Extension Harry Brot GroßbeerenExtension Harry Brot Großbeeren1Extension Harry Brot Großbeeren2Extension Harry Brot Großbeeren3Extension Harry Brot Großbeeren4Extension Harry Brot Großbeeren5
 
Building data
Location
Großbeeren
Floor area
1,225 sqm
Length/width/height
57 / 22 / 7.90
Type of building
Logistics building
Scope of supply and services
Turnkey
Period of construction
March 2020 – Aug 2021
Description of the facility

BREMER has been contracted to enlarge the Harry Brot logistics centre in Grossbeeren by 1280 sqm. The different areas are separated by fire walls. The supporting hall construction is realised with our precast elements, a trapezoidal sheet roof and iso-wall-paneels.
All construction phases are carried out during ongoing operation.