Extension logistics centre

in Großbeeren

Extension Harry Brot GroßbeerenExtension Harry Brot Großbeeren1Extension Harry Brot Großbeeren2Extension Harry Brot Großbeeren3Extension Harry Brot Großbeeren4Extension Harry Brot Großbeeren5
 
Location

Großbeeren

Floor area

1,225 sqm

Length/width/height

57 / 22 / 7.90

Type of building

Logistics building

Scope of supply and services

Turnkey

Period of construction

March 2020 – Nov. 2021

Description of the facility

BREMER has been contracted to enlarge the Harry Brot logistics centre in Grossbeeren by 1280 sqm. The different areas are separated by fire walls. The supporting hall construction is realised with our precast elements, a trapezoidal sheet roof and iso-wall-paneels.
All construction phases are carried out during ongoing operation.