Produkction + office

in Darmstadt

 
Location

Darmstadt

Floor area

15,108 und 7,080 sqm

Length/width/height

106 / 68 / 15.90 and 100 / 17 / 17.20 m

Type of building

Office buildings,  Production facilities

Scope of supply and services

Turnkey

Period of construction

May 2019 - Nov. 2020

Description of the facility

The technology venture AKASOL AG held its ground-breaking ceremony in Darmstadt in July 2019. The new 7,000 sqm headquarter, as well as a modern 15,000 sqm production- and logistic facility (including a test and validation centre) is built on a 20,000 sqm property. Planned to be completed in midyear 2020, AKASOL wants to advance their continual growth with the new construction. The building consists of a 2-storey hall with a mezzanine and a 4-storey office building.